Demonstration of Safe Operation (DOSO) in Malaysia

Demonstration of Safe Operation (DOSO)

If your facility handles hazardous substances above 10% but below the threshold quantities specified under the CIMAH Regulations, you are required to demonstrate that your operations are safe and that major accident hazards are adequately controlled. Our Demonstration of Safe Operation (DOSO) assessment services help manufacturers meet this legal obligation systematically, thoroughly, and in full compliance with the Occupational Safety and Health (Control of Industrial Major Accident Hazards) Regulations 1996

What Is a Demonstration of Safe Operation (DOSO)?

A Demonstration of Safe Operation (DOSO) is a structured safety assessment required under the CIMAH Regulations 1996 for non-major hazard installations — specifically, facilities where the quantity of hazardous substances present is less than the specified threshold quantity but more than 10% of that threshold quantity.

While DOSO sits below the full CIMAH major hazard installation threshold, it carries significant legal obligations. The content of the DOSO safety report must be prepared in accordance with the requirements of Schedule 6 of the CIMAH Regulations 1996.

While DOSO sits below the full CIMAH major hazard installation threshold, it carries significant legal obligations. A manufacturer who falls under DOSO must be able to demonstrate at any time that they have:

  • Identified all possible major accident hazards associated with their industrial activity
  • Taken adequate steps to:
    • Prevent any major accident or minimise its consequences to persons and the environment
    • Provide workers on site with the information, training, and equipment necessary to ensure their safety
  • Prepared and maintained an adequate on-site emergency plan detailing how major accidents will be dealt with

Difference Between DOSO vs CIMAH

It is important to understand where DOSO sits within the broader CIMAH regulatory framework:

DOSOCIMAH
Applies toNon-major hazard installationsMajor hazard installations
Hazardous substance quantityBetween 10% and 100% of threshold quantityAt or above threshold quantity
Key requirementDemonstrate safe operation and maintain emergency planFull safety report, on-site emergency plan, off-site emergency plan
Regulatory basisCIMAH Regulations 1996CIMAH Regulations 1996

If your facility's hazardous substance inventory has grown and now meets or exceeds the full CIMAH threshold, you may need to transition to a full CIMAH assessment. Our team can advise on your current classification and obligations.

What Does a DOSO Assessment Cover?

A DOSO assessment and safety report prepared in accordance with Schedule 6 of the CIMAH Regulations 1996 typically covers:

  • Facility and process description — Overview of the industrial activity, site layout, and hazardous substances present
  • Hazard identification — Systematic identification of all possible major accident hazard scenarios associated with the facility and its operations
  • Risk assessment — Evaluation of the likelihood and consequences of identified major accident scenarios for personnel and the environment
  • Prevention and mitigation measures — Review and documentation of engineering controls, safety systems, and management measures in place to prevent accidents or limit their consequences
  • Worker safety provisions — Confirmation that workers are provided with adequate information, training, and equipment for their safety
  • On-site emergency plan — Preparation or review of an adequate emergency response plan detailing how major accidents will be identified, reported, and managed
  • Schedule 6 safety report — Compilation of all of the above into a formal DOSO safety report meeting the requirements of Schedule 6, CIMAH Regulations 1996

Why Choose Us

Our team has in-depth knowledge of the CIMAH Regulations 1996 and DOSH requirements for DOSO assessments, ensuring your safety report is comprehensive, correctly structured, and fully compliant with Schedule 6 requirements.

From initial classification and hazard identification through to safety report preparation, emergency plan development, and periodic review, we provide continuity of support across the full DOSO compliance lifecycle.

Fast Turnaround

Timely reports with clear interpretation, delivered on schedule so your projects stay on track.

Experienced Team

Our specialists include chemists, environmental scientists, EHS professionals and engineers with real-world industry experience.

Actionable Insights

We provide more than just data. We interpret findings to help improve safety, compliance and operational efficiency.

Our Offices Across Malaysia

Request a Quote or Consultation

If your facility handles hazardous substances at quantities that may fall under DOSO obligations, or if you are unsure of your current regulatory classification under the CIMAH Regulations, our team is ready to help. Contact us today to discuss your DOSO requirements or to arrange an initial screening consultation.